How design, specification and supply fit together when you, your builder and Andrew Baines Interiors plan a bathroom — and why roles should be agreed early.

Three parts of one job

Most bathroom projects involve three distinct pieces of work: design (deciding the layout and look), specification (choosing the exact products and finishes) and supply (getting those products to site). Installation is then carried out by whoever has been agreed — often your own builder or installer.

Design

Design settles where everything goes and how the room should feel. It considers the architecture, the way the room is used, lighting and storage. Getting this right first avoids changes once work has started.

Specification

Specification turns the design into a precise list: which bath, which brassware, which tiles, which finish. A clear specification means your builder knows exactly what is being fitted and can plan the work around it.

Supply

Supply covers ordering and delivering the specified products. It helps to agree who orders what, and when items should arrive, so the site is not held up and nothing is stored longer than necessary.

Agree who does what

Andrew agrees these roles case by case with homeowners and trade professionals. There is no fixed package — the right arrangement depends on the project.

  • Who is responsible for the design and the final specification
  • Who orders and receives the products
  • Who installs, and who handles plumbing, electrics and tiling
  • How questions on site will be answered

For builders and installers

If you are a builder or installer with a client who needs help choosing their bathroom, you can introduce them to the showroom and stay involved. No appointment is needed to browse during opening hours. Use the trade enquiry form to tell Andrew about the project and arrange any dedicated client meeting with him.

Ready to discuss your client’s project?

Make a trade or professional enquiry